Nuclear Power Plant: Steam Turbine Inner Casing Closure
- Turnaround Time Shortened By ONE Month!!!
- Water Charged Hydraulic Nuts.
- Greater Loads Produced Within A Restricted Footprint.
Problem:
- Insufficient loading using conventional torquing methods led to steam leaks due to warped (“smile”) flanges.
- Labor intensive operations led to over budgeted turnarounds.
- Steam path cannot be subjected to contaminants.
Solution:
- Simultaneous tensioning of studs provided precise loading allowing full flange closure .
- Labor hours drastically reduced. Turnaround shortened by one month.
- Water charged hydraulic nuts eliminated contamination concerns.
|
|
|