Home | About Us | Contact Us | FAQ | Site Map
Ask the expert! 

315.768.4855

Gas Turbine Hardware | Case Studies | Bolt Loading Calculator | Literature | Industries Served | Installation Manuals | Service/Repair | Flex Pivots

TENSIONED PRODUCTS

Hydraulic Bolt Tensioner

Hydraulic Nut/ Hydraulic Bolt

High Temperature
Tight Envelope

Radial Fit Bolt

Engineered
Hardware & Tooling

Torque & Nut Replacement

ROTATING EQUIPMENT PRODUCTS

Torque Blocker

Peak Shaver

Hydraulic Clamp Ring

Internal Shaft Clamp

Torque Measure/
Vibration Monitoring

Torque Vibration Damping

COUPLING INSTALLATION EQUIPMENT

Hub Installation Tools

Hub Removal Tools

Plug & Ring Gage

Lapping Tools

Hydraulic Installation Kits

HYDRAULIC PUMPS AND ACCESSORIES

Manual Pump Kits

Air-Operated Pump Kits

High-Pressure Flexible
Hose Assemblies

Custom High-Pressure
Hydraulic Fittings

Steam Turbine Casing Closure

  • Eliminate Stud Heater & Slug Wrench Method
  • 75% Reduction In Installation Times
  • Improved Safety Measures
  • Repeatable, Uniform, Controlled Loading
  • Eliminate Thread Galling
  • Shorter Turnarounds

Problem:

Installation of steam turbine split line casing studs took a two-man crew (24) hours to install using a conventional stud heater and slug wrench method. Inconel studs, required for the 950 deg. F service, were prone to thread galling. Bolt stretch accuracy was difficult to maintain across the complete stud pattern.

Solution:

Original equipment replaced with Riverhawk Hydraulic Rod Tensioning (HRT) System. Installation of studs was reduced by approximately 75%. A two-man crew accomplished closure in (6) hours in intervals of 50% and the final 100% load. The Inconel HRT’s along with the Riverhawk supplied 3” diameter studs achieved a high degree of accuracy in a short amount of time.